Below are Letters of Agreements (LOAs), Memorandums of Understanding (MOUs – which are essentially the same as LOAs), and Review Committee decisions (RCs) from the current and previous contract cycles. For other documents and historical research, consult the ESC PG&E steward database or contact your Union Rep.
Use the search box to the right to filter for relevant documents.
-
LOA 18-02 Service Planning Re-org, New Business Rep, Permit Facilitator
Establishes the New Business Rep and Permit Facilitator classifications; Voluntary relocation incentive program for Estimators, ADE’s, SNBR’s, IPE’s and a few Gas Distribution Engineers; Prevent layoffs and most involuntary relocations for those classifications for two years; RDO’s for Estimators in Design Center locations; Some changes to work process between Estimating offices, and between SNBR and…
-
LOA 18-01 Sr Gas Distribution Engineers
Establishes job descriptions, salary range and other provisions for Senior and Senior Consulting Gas Distribution Engineers and includes revision to existing Gas Distribution Engineer job description.
-
PRC 726 Routine Estimator Upgrade to Supervisor
Clarifies issues around upgrades to supervisor. Routine level employees still in training should NOT be upgraded to Supervisor at all; if this somehow happens, after two weeks their training will be frozen and they will not be allowed to work OT.
-
LOA 17-25 Permit Facilitator Position San Carlos
Immediate offering of a Permit Facilitator position in San Carlos to incumbents in the office, while long term PF classification is still being negotiated.
-
LOA 17-24 Service Planning Strike Team
LOA 17-24 -ESC Service Planning Strike Team
-
LOA 17-17 Relocate Hiring Hall Employees for Express Connect
Relocates HH Estimators to work on Express Connect Pilot in Stockton and Fresno RMC.
-
LOA 17-16-R1 Specialized Estimating Teams
Pilot program where special estimating teams have their own bid codes. Overtime is still shared. EOT and ETP issues addressed
-
LOA 17-12 Incentive Program Refueling Outages
Establishes incentive programs for the next refueling outages.
-
LOA 17-06 Metering Engineers
Combines Electric, Gas and SmartMeter Engineers into one classification, with some separation for Electric and Gas. Updates to Metering Engineer job descriptions.
-
LOA 17-05 Electric Mapping LPE Exam
Changes procedures for Mapping Advancement Exam, like cutoff score, appeals process, test development process, etc.