Below are Letters of Agreements (LOA’s), Memorandums of Understanding (MOU’s – which are essentially the same as LOA’s), and Review Committee decisions (RC’s) from the current and previous contract cycles.  For other documents and historical research, consult the ESC PG&E steward database or contact your Union Rep.

Use the search box to the right to filter for relevant documents.

Found 204 Results

LOA 17-06 Metering Engineers

Combines Electric, Gas and SmartMeter Engineers into one classification, with some separation for Electric and Gas. Updates to Metering Engineer job descriptions.


LOA 17-05 Electric Mapping LPE Exam

Changes procedures for Mapping Advancement Exam, like cutoff score, appeals process, test development process, etc.


LOA 16-26 Eliminate Paid Family Leave (PFL) Waiting Period

This eliminates the one-week waiting period for the newly improved Paid Family Leave benefit.


MOU 16-06 Nurse Report Line

Protects employee privacy when calling the “Nurse Report Line” to report an illness or injury, and provides that information will not be used for discipline. ESC promotes and encourages use of the Nurse Report Line.


MOU 16-05 ETP Governance Committee

Formally established the Estimator Training Program Governance Committee (shared ESC-Management committee) and also working groups from the current re-write projects of Gas and Electric ETP. All changes to the ETP curriculums must be approved by the Governance Committee.


LOA 16-23 Estimator Bypass Pay and New Hire Provisions

Estimator bypassed for Emergency Overtime is paid 2 hours at 2x rate. Settle old grievances on this issue. Establishes a two-year lock-in period for new hires into Estimating positions from outside ESC.


LOA 16-21 (Modifies 16-05) Tuition Reimbursement Language Cleanup

Cleans up and modifies tuition and reimbursement from LOA 16-05.


MOU 16-04 STIP Grievances and Mini-arbitration

Set up a one-time pilot for “mini-arbitration” of STIP grievances that had not been settled at Step 2, eliminating the lengthy LIC process. All these cases were later settled prior to the mini-arbitration hearings.


LOA 16-20 (Modifies LOA 16-18) To Permit Bidding During Retention Period

Establishes minor modification and clarification of LOA 16-18.


LOA 16-12 Gas Transmission Mapping Pipeline Features Lists

Permits expanded use of contractors to do Mapping work. Company commits to more hiring in GT Mapping and to bring work on Pipeline Features Lists in-house, using “Field Design Engineer” classification initially.